Dust Free Greener Blaster
Slurry/Wet Blasting
Rapid Prep’s new and innovative dust-free slurry blaster provides nearly endless opportunities in the blasting and coatings industries. These units allow for blasting in conditions never achievable using the traditional method, while still producing in conventional applications.
- 80% less media consumption
- Dust free blasting
- Can be used with many different abrasives
- Achievable blast pressure 15 PSI-120 PSI
Quote Within 24 Hours Guaranteed
Technical Product Details
Specifications | 350 | 350 Skid Mounted | 760 | 1,200 FSU | Dual Outlet |
Blast Pot | 3.5 cu. Ft. | 3.5 cu. Ft. | 7.6 cu. Ft. | 12 cu. Ft. | 12 cu. Ft. |
Water Tank | 50 gallon | 15 gallon | 100 gallon | 100 gallon | (2) 50 gallon |
Measurements | 350 | 350 Skid Mounted | 760 | 1,200 FSU | Dual Outlet |
Dimensions | 23″L x 63″W x 44″H | 42″L x 22″W x 44″H | 31″L x 78″W x 55″H | 38″L x 84″W x 55″H | 62″ L x 48″ W x 56″ H |
Empty Weight | 750 lbs. | 600 lbs. | 1,030 lbs. | 1,400 lbs. | 1,800 lbs. |
Full Weight | 1,650 lbs. | 1,200 lbs. | 2,900 lbs. | 3,700 lbs. | 4,500 lbs. |
Product Advantages

Standard Equipment for 350
- Engineered welded steel frame
- Full machine hot dipped galvanized/powder coated
- 3.5 Cubic Foot Certified Blast Pot
- 50 Gallon on board water tank
- Pneumatically operated (optional 12 volt)
- Air Requirement: 185 cfm-300 cfm
- Blast Pressures Achievable: 25 PSI-120PSI
Standard Equipment for 350 Skid Mounted
Internal Manifold Options:
3/4” Manifold:
- Air Requirement: 125 CFM Minimum
- 3/4” Blast Hose
- #5 Blast Nozzle
1” Manifold:
- Air Requirement: 185 CFM Minimum
- 1” Blast Hose
- #6 Blast Nozzle
Standard Equipment for 760
- Engineered welded steel frame
- Full machine hot dipped galvanized/powder coated
- 7.6 Cubic Foot Certified Blast Pot
- 100 Gallon on board water tank
- Pneumatically operated (optional 12 volt)
- Air Requirement: 375 cfm-1500 cfm
- Blast Pressures Achievable: 15 PSI-120 PSI
- Surface Profile Achievable: 0-4Mill
Standard Equipment for 1,200
- Full machine hot dipped galvanized/powder coated
- 12 Cubic Ft. Certified Blast Pot
- 100 Gallon on board water tank
- Electrically Operated
- Air Requirement: 600 cfm-1,600 cfm
- Blast Pressures Achievable: 30 PSI-120 PSI
- Surface Profile Achievable: 0-4Mill
Standard Equipment for Dual Outlet
- Engineered welded steel frame
- Full machine hot dipped galvanized/powder coated
- 12 Cubic Foot Two Chambered Blast Pot
- 3+ Hours blasting time on a fill
- Pneumatically operated (optional 12 volt)
- Air Requirement: 375 cfm-1500 cfm
- Blast Pressures Achievable: 30 PSI-120 PSI
- Surface Profile Achievable: 0-4Mill